{"id":34,"date":"2013-10-27T11:27:13","date_gmt":"2013-10-27T11:27:13","guid":{"rendered":"http:\/\/www.lindsey-rail.co.uk\/blog\/?p=34"},"modified":"2014-07-18T17:55:07","modified_gmt":"2014-07-18T17:55:07","slug":"winter-201314-to-do-list","status":"publish","type":"post","link":"http:\/\/www.lindsey-rail.co.uk\/blog\/?p=34","title":{"rendered":"Winter 2013\/14 to-do list"},"content":{"rendered":"<p>In previous years the local area group had a tradition of &#8220;The List&#8221;. This was solemnly passed around at the last steamup of the season, and all present would list just one of their many &#8220;Round Tuit&#8221; tasks awaiting completion, with the understanding that it would be done before the first steamup of the following season. It was just a bit of fun with no adverse consequences for failure (apart from a little gently mickey-taking) but sometimes provided the extra burst of energy needed to finish something off. With no club list in the offing this year, I thought I&#8217;d take time out to produce a list of my own, showing everything that needs to get done on the railway. No deadline, no &#8220;this one by spring&#8221;, no promises; just a warts-and-all glimpse behind the scenes of the average garden railway. Most of these are unfinished jobs, but some are unstarted-but-on-the-wannado-list.<\/p>\n<p><strong>MOTIVE POWER:<\/strong><br \/>\n<strong>Steam<\/strong> (Nos 2 and 5 out of traffic, rest available)<br \/>\nMamod     No1: <del datetime=\"2014-07-18T17:50:37+00:00\">Idle for too many years. Complete overhaul and re-assemble<\/del>.<br \/>\nRheidol   No2: Re-pack piston ring and gland<br \/>\nPooter    No3: <del datetime=\"2014-07-18T17:50:37+00:00\">New pressure gauge<\/del>. Repaint in the next year or three, and possibly rename and number<br \/>\nLady Anne No5: Complete overhaul (axles and bearings done, valve gear still to do)<br \/>\nTrisantonia  : Re-mount rear coupling to ponytruck instead of bufferbeam, so she doesn&#8217;t pull the first wagon off on tight curves.<br \/>\nTennyson     : <del datetime=\"2013-10-27T18:59:42+00:00\">Change couplings to choppers<\/del>. Name and number plates<br \/>\nLyn          : Repaint scorched smokebox. Adjust coupling height. Name and numberplates. Complete repaint?<br \/>\nRotkopf      : Descale boiler. Detail and spot repainting. R\/C?<br \/>\n<strong>Battery<\/strong><br \/>\nSalem      : Find and fix electrical fault<br \/>\nBaguley    : Name and number. Repaint?<br \/>\nFowler     : Repair drop damage and re-assemble<\/p>\n<p><strong>STOCK:<\/strong><br \/>\n<strong>Passenger<\/strong><br \/>\n4 ex Mid-Derbyshire coaches: Repaint all 4 into LR colours. <del datetime=\"2013-10-31T10:22:03+00:00\">Repair\/replace broken bogies on 2<\/del>. <del datetime=\"2013-10-31T10:22:03+00:00\">Replace battery box on 1<\/del>. Replace missing\/damaged running boards<br \/>\n6 Locomotion &#038; 1 IP kits still to finish.<br \/>\nGoods<br \/>\n<del datetime=\"2013-10-31T10:22:03+00:00\">2 Brandbright 4w opens cosmetic repair<\/del>, all 12 to repaint and number, ditto 6 bogie opens<br \/>\n1 Bbt van, 1 accucraft brake, <del datetime=\"2013-10-31T10:24:31+00:00\">2<\/del> 1 s\/h wagon to repaint, number and change couplings.<br \/>\nUnfinished kits: 3x IP cattle vans. 3x Bbt 4w vans, <del datetime=\"2013-10-31T10:24:31+00:00\">1 Andel C&#038;M Brake<\/del>, 8 Imp skips.<\/p>\n<p><strong>INFRASTRUCTURE<\/strong><br \/>\n<strong>Track:<\/strong><br \/>\n<del datetime=\"2014-07-18T17:50:37+00:00\">2<\/del> 1 points in upper circuit with broken tiebar-blade joints to repair\/replace.<br \/>\nNumerous other points missing check-rails, count up number required and order from PECO.<br \/>\nSome joints starting to look a bit 50p: Identify and relay on smooth alignment.<br \/>\nMore experiments with decorative ballasting, once satisfied with alignment.<br \/>\n<strong>Civil Engineering<\/strong>:<br \/>\nRepair subsidence on lower level crossing.<br \/>\nRebuild lift-out bridge with a bit more breathing-space.<br \/>\nCut back cutting slopes to gentler, more natural angle and plant\/seed.<br \/>\n<strong>Works<\/strong><br \/>\nStation platforms at Thimbleby, Minting (Down), <del datetime=\"2014-07-18T17:50:37+00:00\">Hatton and<\/del> Wragby (branch)<br \/>\nAny\/all station and other buildings. <em>Get jigstones production-line organised!<\/em><br \/>\n<strong>S&#038;T<\/strong><br \/>\nComplete signal kits on hand, ditto lever frames.<br \/>\nConnect points to levers.<br \/>\nBlock instruments, bells and associated wiring.<\/p>\n<p><strong>ADMIN:<\/strong><br \/>\n<strong>Historical &#8220;research&#8221;<\/strong><br \/>\nComplete fictional history for website. Complete train-graph timetables and use to work out fictional fleet, then use this information to create plausible numbers for locos and stock.<br \/>\n<strong>Operations<\/strong><br \/>\nFrom traingraph, create timetable for Horncastle branch for use on &#8220;Operating Days&#8221; and try it out (solo &#038; with wifey assistance) to test feasibility.<br \/>\nPrepare car-cards and way-bills for proper wagonload freight ops for &#8220;Operating Days&#8221;, and road-test (note that this requires all wagons to be individually numbered, with the option of removable loads for opens too)<br \/>\nDraft simple 1-page rulebook and how-to guide for &#8220;Operating days&#8221;<br \/>\n<em>Plan, advertise and actually HOLD an &#8220;Operating Day&#8221;<\/em><\/p>\n<p>Enough there to keep me busy for a few years, if I retire tomorrow&#8230;.. Would be nice to get some of them done though, particularly those relating to Operating Days, in which I plan to use the model to simulate a real narrow gauge branch rather than meander gently round in circles- fun though that is.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In previous years the local area group had a tradition of &#8220;The List&#8221;. This was solemnly passed around at the last steamup of the season, and all present would list just one of their many &#8220;Round Tuit&#8221; tasks awaiting completion, &hellip; <a href=\"http:\/\/www.lindsey-rail.co.uk\/blog\/?p=34\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"categories":[1],"tags":[],"class_list":["post-34","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"jetpack_featured_media_url":"","_links":{"self":[{"href":"http:\/\/www.lindsey-rail.co.uk\/blog\/index.php?rest_route=\/wp\/v2\/posts\/34","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.lindsey-rail.co.uk\/blog\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.lindsey-rail.co.uk\/blog\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.lindsey-rail.co.uk\/blog\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.lindsey-rail.co.uk\/blog\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=34"}],"version-history":[{"count":6,"href":"http:\/\/www.lindsey-rail.co.uk\/blog\/index.php?rest_route=\/wp\/v2\/posts\/34\/revisions"}],"predecessor-version":[{"id":63,"href":"http:\/\/www.lindsey-rail.co.uk\/blog\/index.php?rest_route=\/wp\/v2\/posts\/34\/revisions\/63"}],"wp:attachment":[{"href":"http:\/\/www.lindsey-rail.co.uk\/blog\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=34"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.lindsey-rail.co.uk\/blog\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=34"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.lindsey-rail.co.uk\/blog\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=34"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}